Passive Shoulder-Support Exoskeleton Sourcing Brief
Record type: Sourced to specification. This is a sourcing brief, not an in-stock offer or a claim that one model fits every destination.
Repeated or sustained overhead industrial work evaluated through a controlled workplace ergonomics trial.
Start with the operating requirement
Factories can quote quickly when they receive a product name, but comparable quotations require a shared definition of the job, environment, destination, acceptance method and support boundary.
Specification checklist
| # | Requirement to specify |
|---|---|
| 1 | supported movement and assistance curve |
| 2 | user size/fit range |
| 3 | device weight |
| 4 | freedom of movement |
| 5 | don/doff and adjustment time |
| 6 | PPE/tool interaction |
| 7 | soft-goods cleaning |
| 8 | replaceable parts and inspection interval |
Factory and supplier screening
- Confirm the legal company behind the quotation and whether it manufactures the relevant system or trades it.
- Request exact model, revision, component and software details rather than a generic catalogue.
- Separate supplier-provided documents from items whose issuer, model scope or validity has been checked.
- Compare warranty exclusions, escalation path, remote support, spare-parts availability and expected response time.
- Record quotation validity, MOQ, production lead time, Incoterm, packing dimensions and excluded costs.
Proposed acceptance plan
- multi-user fit trial
- representative task cycle
- discomfort and movement-restriction log
- PPE compatibility check
- cleaning and reassembly test
- inspection/training/spares review
Evidence status before a purchase decision
| Evidence item | Current status |
|---|---|
| Manufacturer identity | Not yet requested at the generic brief stage |
| Exact model and datasheet | Not yet requested |
| Quotation and commercial terms | Not yet requested |
| Destination documents | Buyer/local review required after a model is shortlisted |
| Factory or sample test | Planned from the agreed acceptance criteria |
| Freight plan | Prepared after packed dimensions, weight and destination are confirmed |
What to send Eviehome
- task video and duration
- work heights and tools
- user population
- existing PPE
- trial outcome measures
- country and occupational-safety reviewer
Related sourcing vertical
This brief belongs to Industrial Exoskeleton Sourcing in China. The vertical page explains the broader selection, risk and supplier-comparison method.
View the full vertical sourcing guide.
Review note
Last reviewed 13 July 2026. Product, price, availability, certification and lead-time facts are added only after a supplier and exact model are identified.
Turn your requirement into a factory shortlist
Send the destination, use case, target date and the specifications you already know. Eviehome will clarify the missing inputs before approaching potential suppliers.
